Mountain Tunnel China
13km of the Gaoligong mountain tunnel was driven by one CREG gripper TBM and the rest was excavated by Drill and Blast in the Darui Railway Project The CREG belt conveyor system powered by a centralized head drive with four 315kW electrical motors guaranteed fast and smooth transport of excavated material