PDF Reducing Drill and Blast Cost through Blast
The blast performance in terms of When drilling and blasting the ore zones in Block the BCM blasted per hole would increase from 72 C pit Proposal 2 gives better alternative set of drill to 108 m3 an increment of 50% The total cost per and blast parameters with the minimum total cost BCM blasted when Proposal 2 is adopted as a per BCM of ore